Tuesday, July 12, 2016

PROJECT 3, WORKING DRAWING AND SYSTEM INTERGRATION

This final task required us to produce a set of working drawings for a Science Center we designed for our Interior Design project 2 module. 

The drawings to be produced are:

SETTING OUT PLAN 
FURNITURE LAYOUT PLAN
REFLECTED CEILING PLAN 
MECHANICAL AND ELECTRICAL PLAN
FLOOR FINISHES
SECTION
WATER SUPPLY 
DETAILED DRAWING 








PROJECT 3, WORKING DRAWING AND SYSTEM INTERGRATION

This final task required us to produce a set of working drawings for a Science Center we designed for our Interior Design project 2 module. 

The drawings to be produced are:

SETTING OUT PLAN 
FURNITURE LAYOUT PLAN
REFLECTED CEILING PLAN 
MECHANICAL AND ELECTRICAL PLAN
FLOOR FINISHES
SECTION
WATER SUPPLY 
DETAILED DRAWING